Connect with us

Uncategorized

FGN Approves Emergency Intervention On Abuja-Lokoja Highway, Mutual Termination Of 4 Contracts

Published

on

…Sets 7 days, 10th and 20th December Ultimatums On 3 projects
Hassan Taiye

The Federal Government of Nigeria, FGN has directed that all outstanding works along the Abuja-Lokoja Highway be compiled for immediate emergency intervention, even as it announces mutual termination of four (4) contracts in the North-central, mainly for effluxion of time.

The director, Press and Public Relations in the Federal Ministry of Works, Mohammed A. Ahmed, dropped the hint while briefing journalists on behalf of the Minister of Works, Senator David Umahi, on Wednesday in Abuja on the outcome of a meeting the minister held with some contractors.

Assisted by the Federal Controller of Works, Kogi State and the Special Adviser on Media to the Minister, Barr Orji Orji, to the left and right, respectively, while delivering the speech, Ahmed said, “Honourable Minister of Works has directed that all outstanding works from Abuja to Lokoja, including all to be mutually terminated projects, be compiled for immediate emergency intervention.”

The Minister expressed gratitude to Mr President for his kind interventions on the entire stretches of the road, Abuja-Lokoja, which is about 179km x 2,358km.

He apologised and appealed to all road users of the expressway to bear with the ministry on the inconveniences they are experiencing due to multiple intervention projects that are ongoing, assuring that the works will be completed soon.

On the flipside, the Minister announced mutual termination of the Contract for the Provision of Culverts and Drains at Flood Prone Area on Federal Road Network in the North-Central Zone: Section 2, 3km: CH.13+000 – CH.16+000, Abuja – Lokoja C/No.8493(Rigid Pavement, being handled by Messrs. Sadogi Nigeria Limited, a project awarded April 4, 2024, with only 39.04 percent completed and 112.88 percent time elapsed based on effluxion of time.

He also directed mutual termination of the Contract for the Rehabilitation of Abuja – Lokoja Section 4A: CH. 23 + 400 – CH. 26 + 400 RHS in Kogi State, Contract No.8476 being handled by Messrs Venus Construction Nigeria Ltd, which was awarded on 13th July, 2024 and only 33.79% completed with 131.15% time elapsed based on effluxion of time.

Away from Abuja-Lokoja, the Contract for the Reconstruction of Okene-Ajaokuta-Itobe Road in Kogi State. Contract No. 7648 being handled by Messrs CCECC Nigeria Ltd, which was awarded on 18th November, 2022 and only 2.02% completed with 146.92% time elapsed, has been declared mutually terminated based on effluxion of time. The Supervisory Consultancy Services also mutually terminated for lack of funding.

In the same vein, the Contract for the Rehabilitation of Lokoja Shintaku-Dekina-Ayingba Road Contract No. 7239 being handled by TEC Engineering Company Nigeria Ltd, which was awarded on 3rd February, 2022 and only 1.04% completed with 188.77% time elapsed, has been mutually terminated based on effluxion of time. The Supervisory Consultancy Services suffered same fate for lack of funding.

In all cases of mutual termination above, the Minister directed the contractors to work within the limit of the advance paid to them after which final determination of account would be carried out.

For other other contracts not to be terminated, the Minister issued ultimatum for completion or resumption of works with commitment.

Still on the Abuja-Lokoja, the Minister commended Messrs JRB Construction Nigeria Limited for their performance on the rehabilitation works on Section 1 of and directed that the project be completed before 10th December, 2025.
On the Contract for the Rehabilitation of Abuja – Lokoja Section IVB (Flooded Section, CH.23+400 – CH.26+395) LHS Contract No. 8490 being handled by Messrs. Sailthrough Engineering Service Ltd, Umahi has directed that the contractor immediately submit a letter of commitment to complete the project on or before the 20th December, 2025. He however admitted that the contractor had complied, “even though we are owing him”.

As for the Reconstruction of Existing pavement and completion of additional pavement on Dualisation of Abuja – Lokoja highways Section III: Abaji – Koton Karfe (Ch. 82 + 000 – CH. 131 + 362, Contract No. 7333, awarded on 7th March, 2022 and 16.71% completed with 125.00% time elapsed, the Minister directed that they should resume work in bad sections of the road within seven, 7, days, counting from the day of the meeting, and reinstate the shoulders up to stone base level and patch the potholes on the carriageway for free flow of traffic during construction.

On the Contract for the Rehabilitation of Koton Karfe – Abaji road (47.862km: CH. 82 + 000 – CH. 129 + 862) Abuja bound, along Abuja – Lokoja route in Kogi State, Contract No. 8552 handled by Trucrete Solutions Limited, which was awarded on 22nd May, 2024 and 40% completed with 58.33% time elapsed, the Minister expressed satisfaction with advancement of work.

According to him, the road is 47.862Km road and is being executed on concrete, CRCP, and the project is progressing steadily so it can be completed as scheduled.

Continue Reading
Click to comment

Leave a Reply

Your email address will not be published. Required fields are marked *

Uncategorized

Kwara: Ifelodun Travellers Transport System Revived

Published

on

  • As Council Signs MoU With P&A Contract Ltd

Stephen Olufemi Oni, Ilorin

The Ifelodun local Government, under the leadership of Hadji Abdulrasheed Femi Yusuf, has signed a Memorandum of Understanding (MoU) with P & A Contract Limited for the construction of a modern motor park in Amoyo, as the Council moves to revive the Ifelodun Travellers transport system and improve transportation within the Local Government.

Speaking during the MoU signing ceremony at the Council s Contact Office in Amoyo, the Chairman explained that the decision to construct the motor park was driven by the need for Ifelodun Local Government to establish its own transport identity, intended to ease people’s transportation problem.

He recalled that residents travelling to and from Ifelodun had, over the years, relied on transport facilities at Offa Garage and Maraba in Ilorin, stressing the need to create a dedicated transport hub that would serve the people of the Local Government.

“At some point in the history of Ifelodun Local Government, we had Ifelodun Travellers, which does not exist anymore. I don’t think there is anything wrong with bringing that identity back to the limelight. Now, we want to add value to that identity,” the Chairman said.

He added that the Council was also working with relevant stakeholders to bring in 10 units of Korope buses, which would commence operations as soon as possible.

“We are working with the NURTW, Kwara State Chapter, for guidance and to ensure that the operation runs smoothly,” he added.

The Supervisory Councillor for Works and Infrastructure Development, Mrs. Kolo Rebecca, explained that the proposed park would feature several amenities, including a garage, warehouse, 100-unit shopping complex, parking spaces and general toilets.

She said the facilities were designed to boost economic activities, improve the image of the Local Government and provide a more convenient transportation system for residents.

According to her, the initiative is also in line with the efforts of the Kwara State Governor, Mallam AbdulRahman AbdulRazaq, to take governance and development directly to the grassroots.

The contractor, Mallam Jimoh Toheeb Abolore, assured the Local Government of the prompt execution of the project, promising that the construction would meet the required standards and contribute positively to the image and development of Ifelodun Local Government.

Those in attendance included the Vice Chairman, Hon. Nike Ajibola; Secretary to the Local Government, Dr. Kamil Akorede; DPM, Mallam Ayinde Salman; LGT, Mallam Usman Waheed; Chief of Staff to the Chairman, Chief Ademola Zubair; Head of Works, Engr. Awodi Muhammad; Land officer, Tola Kadir and other Special Assistants.

Continue Reading

Uncategorized

Lawyer Demands Release of Detained Kano Blogger, Maryam Shehu

Published

on

By Hassan Agboola

A lawyer and human rights activist, Hamza Nuhu Dantani, has called for the immediate release of Kano-based blogger, Maryam Shehu, who he said has been in the custody of the Economic and Financial Crimes Commission (EFCC) for almost 30 days.

Dantani, in a statement on Monday, said the prolonged detention of Shehu was becoming difficult to reconcile with the rule of law and provisions of the 1999 Constitution, particularly her fundamental right to personal liberty.
He questioned why Shehu should remain in detention for nearly 30 days, particularly over an offence he described as ordinarily bailable.

“How on earth can a person be detained for almost 30 days and counting, particularly in relation to an offence that is ordinarily bailable, without meaningful consideration of her liberty and constitutional rights?” he asked.
Dantani said the EFCC’s powers to investigate did not give the commission the right to detain a suspect indefinitely, punish her before trial or disregard her fundamental rights.

He also criticised the alleged practice of photographing persons in EFCC custody and publishing their images online while they remain presumed innocent.
Citing Section 36(5) of the Constitution, Dantani said the law guarantees the presumption of innocence until a suspect is proven guilty by a competent court.

He warned that publicly portraying suspects as criminals before trial could amount to subjecting them to public punishment and humiliation.
“The EFCC is a law-enforcement institution. It must therefore be the first institution to demonstrate obedience to law. It cannot demand respect for law from citizens while appearing to disregard constitutional safeguards itself,” he said.

Dantani urged the commission to either charge Shehu before a competent court if it has credible evidence against her or release her immediately
.
“We call on EFCC to respect the Constitution, respect presumption of innocence and respect fundamental right to personal liberty. Investigation is not conviction. Detention is not punishment. And an allegation is not guilt,” he said.

Continue Reading

Uncategorized

Cristiano Ronaldo’s Comment on Lionel Messi’s Tribute to His Dad Becomes Most-Liked Instagram Comment

Published

on

By Fabian Apechihin

Cristiano Ronaldo’s heartfelt message to Lionel Messi following the death of his father, Jorge Messi, has reportedly become the most-liked comment in Instagram history.

Jorge Messi died on August 7 in Rosario, Argentina, aged 68. Five days later, Messi paid tribute to his late father in an emotional Instagram post featuring a photo of the pair.

In the post, Messi wrote, “Te amo, pa” — meaning “I love you, Dad” — alongside a lengthy tribute reflecting on his father’s influence and the pain of losing him.

Among the many reactions from fans, celebrities and fellow footballers was a message from Ronaldo.

“Un abrazo enorme para ti y los tuyos en estos duros momentos, Leo. Mucha fuerza,” Ronaldo wrote, which translates to: “A huge hug to you and yours in these tough times, Leo. Much strength.”

Ronaldo’s comment reportedly attracted more than 6.86 million likes and over 86,000 comments, making it the most-liked comment on Instagram.

The previous record was also held by Ronaldo, whose comment on Kylian Mbappé’s announcement of his move to Real Madrid reportedly received more than five million likes.

Other football stars also expressed their condolences to Messi. Neymar Jr.’s message, translated as “Much strength for you and your family. Big hug,” reportedly received more than 1.6 million likes, while David Beckham’s comment expressing support for Messi and his family attracted more than 300,000 likes.

In his tribute, Messi described his father’s death as difficult to comprehend, saying he struggled to accept that he would no longer see or speak with him.

Messi also recalled how his father had encouraged him to play at the 2026 World Cup despite his deteriorating health. He said his father had hoped to watch him compete and had planned to travel if his condition improved.

According to Messi, he had promised his father that Argentina would reach the final so he could be there. Although Argentina reached the final, his father was unable to attend.

Reflecting on the loss, Messi said he had wanted to win the tournament and bring the trophy to his father but ultimately struggled physically during the competition.

The emotional tribute highlighted the close bond between Messi and his father and the profound impact of his loss on the football superstar.

Continue Reading

Trending

Copyright © 2017 Zox News Theme. Theme by MVP Themes, powered by WordPress.