Connect with us

News

UNIBEN Post Graduate Students Protest Hike In School Fees

Published

on

By Ikhili Monday EBALU, Benin City 

Activities at the University of  Benin was on Tuesday disrupted  as   post-graduate students and security operatives in the institution clash.

The post-graduate students were protesting introduction of what they termed payment of oral defence fees (External examiner fees) by the school management.

They gathered at the school gate to block the entrance when the school security operatives reportedly swooped on them.

It was during the fracas that two of the students were reportedly injured and taken to the school clinic for medical attention.

A breakdown of the oral defence fee otherwise known as ‘external examiner fees’ showed that Phd students are to pay N90,000, MSc students are to pay N60,000 while Pgd students are to pay N30,000.

What angered the students was that they would not defend their thesis and get their results without payment of the fees.

In the protest letter presented by the protesters, the students claimed that the new levy was not captured in the school financial requirement during the admission process.

They said the levy was to be paid into a UNIBEN Cooperative account instead of Remita (TSA).

Also, they alleged that some departmental officials are already demanding for bribe from them ‘with the promise to help them circumvent the external levy fees.

One of the protesters who pleaded anonymity said the university management wants to make them pay the external examiner.

He said, “What they are calling oral defence fee or Proposal Defence fee if for us to pay external examiners to look at our thesis. 

“We stage a protest two weeks ago and part of the recommendation was for the management to make news applicants pay. We have them two weeks ultimatum to revert the decision.

“The two weeks elapsed and we decided to stage this protest. We want to collect our results and go. The school security had a clash with us and some students were injured.”

Spokesman of the institution, Mr. Michael  Osasuyi, said the new levy was proved by the institution’s council and that management only carried out directive of the council.

Michael stated that some of the post-graduate students have complied and paid but others are resisting payment.

He said the levy was to enable the post-graduate programmes run smoothly without hitches.

He said those that failed to pay were not ready to defend their thesis and graduate from the institution.

Meanwhile, In order to improve the educational quality of her students, the University of Benin (UNIBEN) has deployed the first indigenous software for the conduct of Computer Based Test (CBT) of internal and external examinations.

Vice Chancellor of the University, Prof. Osasere Faraday Orumwense made the revelation during the institution’s 2017 Information Communication Technology (ICT) Day.


Orumwense also said that plans were underway to launch the Uniben  Open Course wave which according to him, will make the University top the rankings in Webometrics.

This was contained in a press statement issued by the University’s spokesman, Mr. Michael  Osasuyi.

Osasuyi sad, the Director of Nigeria Research and Education Network (NREN), Abuja, Dr. Joshua Atah made presentation at the event through live streaming to audience.

He said the live streaming titled: “Unlimited Access to Learning for Everyone, Everywhere:  ICT the Rostrum”  was aimed at buttressing the efficiency of ICT in the 21st century .

According to him, Dr. Josha Atah in his lecture posited that learning has gone beyond gathering in a classroom as it can be deployed from different locations to a large group of persons.

The University’s spokesman further quoted the lecturer as saying, “I-LABS, E-Libraries, E-books, E-Resources, Repositories, Edu-roam and video-driven lectures like Youtube are some of the huge benefits of ICT which saves cost, as well as human and non human resources”.

Continue Reading
Click to comment

Leave a Reply

Your email address will not be published. Required fields are marked *

News

Hon. Hamma Adama Ali Kumo Applauds APC Consensus, Declares Full Support for Dr. Jamilu Gwamna and Governor Yahaya’s Senatorial Bid

Published

on

By

Hon. Hamma Adama Ali Kumo, National Deputy Financial Secretary of the All Progressives Congress (APC), has congratulated Dr. Jamilu-Isiyaku Gwamna on his emergence as the party’s consensus governorship candidate for Gombe State ahead of the 2027 general elections.

In a statement issued in Abuja, Hon. Kumo described Dr. Gwamna as “a visionary leader, accomplished technocrat, and grassroots mobilizer whose credibility and capacity will strengthen the APC’s position in Gombe.” He noted that the consensus arrangement reflects the party’s commitment to unity and inclusiveness, adding that it is a step toward consolidating APC’s achievements in the state.

Hon. Kumo called on all aspirants who contested for the governorship ticket to rally behind Dr. Gwamna, stressing that collective effort is essential for the APC to secure victory. “Every aspirant remains a vital pillar of our party. By joining hands with Dr. Gwamna, we can ensure APC’s continued dominance and deliver progress for the people of Gombe,” he said.

He further commended Governor Muhammadu Inuwa Yahaya for his exemplary leadership, which has brought peace, infrastructural development, and political stability to Gombe State. Hon. Kumo emphasized that the governor’s guidance was instrumental in the smooth adoption of consensus candidates, describing him as “a leader whose vision has transformed Gombe and whose legacy will endure.”

Hon. Kumo also reaffirmed his support for Governor Yahaya’s senatorial aspiration, expressing confidence that his wealth of experience will bring quality representation to the National Assembly. He noted that Yahaya’s senatorial bid complements Dr. Gwamna’s governorship candidacy, creating a formidable team to advance APC’s mission in Gombe.

Concluding his remarks, Hon. Kumo urged party members, stakeholders, and the electorate to remain steadfast in their support for APC candidates, assuring that with unity and determination, the party will deliver victory and sustain progress in Gombe State.

Continue Reading

News

Nassarawa 2027: Crisis Rocks APC as Lawyer petitions governor Sule anointed Aspirants over dual membership of SDP/APC.

Published

on

By

A legal practitioner in Nasarawa State and member of the All Progressives Congress (APC), Barr Tari Trochon has submitted a Formal petition to the National Secretariat of the party demanding proper investigation into the alleged dual membership of Senator Aliyu Ahmed Wadada.

Senator Wadada has won elections into the Senate in 2023 on the platform of the Social Democratic Party (SDP) and has emerged the preferred choice of Governor Abdullahi Sule of Nassarawa State for the APC Governorship primaries scheduled for May 21st 2026.

According to the petition signed by Barr Trochon from Nakere ward of Wamba LGA, “we demand immediate investigation into Wadada membership and compel him to produce verifiable evidence of resignation from the SDP which should be verified from the national leadership of the SDP and not forged documents.

“His disqualification from the participation in the primaries if he fails to establish lawful and exclusive membership of the APC among other legal violations of the Constitutional provisions by Wadada participating in the process while holding dual membership of SDP and APC”

The legal Practitioner warned that allowing Wadada participate in the forth coming gubernatorial primaries would amount to institutional endorsement of illegality that will set the grounds for pre-election legal challenges that might lead to disqualification.

” The enormous credibility issues bothering on how his failure to inform the Senate of his alleged defection, nine months after, provides a fertile ground for litigations that may be costly to the APC in Nasarawa State if he is not stopped.

“We are aware that the SDP is set to take Senator Wadada to court over his defection to APC while still maintaining his membership with SDP simultaneously” he said.

The Petitioner added that in view of time constraint, he will be left with no other option than to proceed to court in order to save the APC in Nasarawa State from imminent problems that may cost us electoral misfortunes.

“There is prima facie infraction of section 222 of the Constitution of the Federal Republic of Nigeria, 1999 (as amended), section 77 of the Electoral Act 2026, Conventions of the Senate and clear expressions of lack of credibility and character which must be looked into.

“He shouldn’t go into our Direct Primaries, and we’ll ensure the Courts stop him from further participation” he said.

He maintained that the Petition has since been submitted to the APC national Secretariat, signed received and acknowledged.

Continue Reading

News

NEW LAFIA BYPASS ENDS YEARS OF TRAFFIC NIGHTMARE, TRANSFORMS MOBILITY AND LIVELIHOODS

Published

on

By

BY MOHAMMED MUSA

Residents and motorists in Nasarawa State are already feeling the relief that comes with good infrastructure, as the main construction of the Lafia bypass has been completed, slashing travel time through the state capital from 45 minutes to just 15 minutes.

The bypass, a critical section of the Keffi Road Phase II project, was constructed by China Harbour Engineering Company, CHEC, and its completion is quietly transforming local traffic conditions. Although the formal handover is still being prepared, many residents and drivers say the improvement in travel time and road environment is unmistakable.

For years, Lafia, the capital of Nasarawa State, has groaned under the weight of heavy transit traffic. As a major gateway linking Abuja to Makurdi and the eastern corridor, all long-haul vehicles had no choice but to crawl through the city centre. The result was predictable: congestion, wasted man-hours, higher fuel consumption, and increased safety risks for both residents and commuters.

However the story has changed.
Abdullahi Mohammed , a small shop owner in Lafia and a regular traveler on the route, captures the mood on the street. “It used to take about 45 minutes to pass through the city, especially when heavy trucks were on the road. Traffic jams and delays were common,” he said. “Now, with the completion of the Lafia bypass, it only takes about 15 minutes to get across. These past few days, the roads feel much smoother, and going out is more reassuring.”

The impact is even more direct for commercial drivers who earn their living on the road. A freight driver who spoke with our correspondent explained that the old route through the city was not just slow but costly. “Previously, vehicles had to pass through the city, which was time-consuming, increased fuel consumption, and posed safety risks,” he noted that, “now with the bypass, we save time and it’s safer. This is very important for those of us in transport because we save on fuel consumption and time spent on the road, which has greatly improved profitability.”

It is worthy of note that, Lafia has long endured heavy transit traffic pressure, with urban roads often congested during peak hours. The city’s status as an administrative and commercial hub means that local traffic already competes for limited road space. The hundreds of trailers and tankers heading to Benue, Cross River, and beyond, through Lafia put a lot of strain on Lafia’s inner roads.
With the completion of the bypass’s main works, transit vehicles will gradually be diverted, easing the burden on city traffic. The benefit goes beyond speed. Improved road conditions will also provide more efficient channels for agricultural product transport and daily goods circulation. Nasarawa is an agrarian state, and farmers along the corridor stand to gain from faster access to markets in Abuja and Makurdi. For residents, it means fresher produce, lower transport costs, and a tangible lift in quality of life.

The bypass is not just another road; it is a strategic intervention that had stalled for years before the current administration revived it. Delivering it required more than engineering skill, it demanded discipline, planning, and resilience.

Despite a complex security environment, the CHEC construction team advanced steadily by strengthening site management and optimizing construction organization. The company ensured the smooth completion of the section in record time, maintaining standards across earthworks, hydraulic structures, stone base, asphaltic concrete, and drainage.
The result is a road that meets specification and already delivers value before formal commissioning. Preparations for handover are now underway, and the bypass’s traffic relief function will gradually take effect. Industry observers note that CHEC’s ability to deliver under pressure reinforces its reputation for quality and timely delivery on federal road projects across Nigeria.
Engr Shuaibu Abdullahi the Principal Engr Federal Ministry of Works Lafia Field Headquarter, Nasarawa State couldn’t have put it better while commending CHEC and the impact of the bypass: “The Lafia bypass road project stands as a transformative and important road corridor for both the community along the road and commuters. By significantly reducing travel time between Lafia and Makurdi, easing traffic congestion within Lafia metropolis, and lowering vehicle maintenance costs, the project enhances mobility, productivity, and overall quality of life. Equally impactful is the lifesaving construction of drainage systems in Mararaba, a deliberate corporate social responsibility effort by the contractor aimed at mitigating the effects of perennial flooding, safeguarding lives, property, and livelihoods. Together, these interventions not only improve access to markets for farm produce but also reinforce a commitment to sustainable development and community well-being.”

In a similar vein, Abdullahi Shehu Kasimu the Village head of Mararaba Akunza gave commendation to CHEC for its Corporate Social Responsibility works to control flooding on the Mararaba axis of the road corridor: “On behalf of the Mararaba Akuza community, we wish to express our sincere appreciation to Messrs CHEC for coming to our aid through the expansion of drainage facilities in Mararaba Akuza. For many years, the community suffered persistent flooding that damaged homes and property, but this intervention has brought much-needed relief.
Today, residents are already experiencing the positive impact of the upgraded drainage system, which has significantly improved water discharge and offers lasting protection against future flooding.
We also extend our gratitude to His Excellency, Engr. A. A. Suleiman, the Executive Governor of Nasarawa State, for his prompt response to our concerns and support for this intervention”.

Expectation is high in Lafia. “If it can be fully opened soon, it will be good for all of us,” said Aliyu Subair, echoing a view expressed by several residents. For traders, students, civil servants, and transporters, the bypass represents time recovered and costs saved. For the state government, it frees up inner-city roads for local use and reduces maintenance pressure caused by heavy-duty vehicles.

As follow-up works continue, this vital regional corridor is steadily unlocking its value for people’s livelihoods and national development. The bypass does three things at once: it cuts travel time by 66 percent, improves road safety by separating through-traffic from city traffic, and creates an economic artery for Nasarawa and neighboring states.

The completion of the main works is proof that with political will, proper funding, and competent contractors, Nigeria can turn frustration into free flow. CHEC’s delivery of the Lafia bypass to good standard and in record time sets a benchmark for how critical road interventions should be executed.

For Abdullahi Sabo, the shop owner, the change is simple but profound: “Going out is more reassuring.” For Nigeria’s transport economy, it is another step toward an integrated, efficient road network.

The Lafia bypass may have been built quietly, but as an important local transportation milestone, the project has improved the regional road network, eliminated urban congestion, and enhanced traffic safety. Supported by complementary drainage works, it has addressed flooding issues affecting livelihoods, effectively driving commercial and agricultural upgrades along the route, revitalizing the regional economy, and becoming a benchmark project for high-quality infrastructure cooperation between China and Nigeria

Continue Reading

Trending

Copyright © 2017 Zox News Theme. Theme by MVP Themes, powered by WordPress.